FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder7.40.0AIncludes: R&R Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cylinders9.50.0AIncludes: R&R Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Piston or Connecting Rod
Add the Following If Performed With Piston & Ring Jobs
Main Bearings, Renew0.70.0A
Crankshaft, Renew4.30.0ADoes Not Include: R&R Engine.
Oil Pump, Renew2.40.0A
Oil Pump Screen, Clean0.20.0A
Timing Chain, Renew
Camshaft2.30.0A
Silent Shaft2.00.0A
Tune-Up0.50.0A