| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Diagnose/Test |
| Oil Leak, Diagnosis | 1.0 | 0.0 | B | |
| Replace |
| Complete Assembly Without Transfer Of Parts | 11.0 | 0.0 | B | Does Not Include Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| NOTE |
| With Skid Plate, Add | 0.3 | 0.0 | B | |
| Complete Assembly With Transfer Of Parts | 13.9 | 0.0 | B | Includes: Transfer All Fuel And Electrical Units. Does Not Include Transfer Of Optional Equipment. |
| NOTE |
| With Skid Plate, Add | 0.3 | 0.0 | B | |
| Long Block | 18.4 | 0.0 | A | Includes: R&I Engine And Replacement Of All Necessary Components. |
| NOTE |
| With Skid Plate, Add | 0.3 | 0.0 | A | |
| Short Block | 21.4 | 0.0 | A | Includes: R&I Engine And Replacement Of All Necessary Components. |
| NOTE |
| With Skid Plate, Add | 0.3 | 0.0 | A | |
| To R&R Cylinder Head, Add | 3.4 | 0.0 | A | |
| To Grind Valves, Add | 5.0 | 0.0 | A | |
| Overhaul/Rebuild | 32.4 | 0.0 | A | Includes: Disassemble & Clean Engine, Ridge Ream & Hone Cylinders. Fit Pistons, Pins, Rings, Pins, Main & Rod Bearings, Grind Valves And Tune-Up. |
| NOTE |
| With Skid Plate, Add | 0.3 | 0.0 | A | |