FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation






INSTALLATION

1. Install rear transmission cooler lines at transmission. Tighten fittings to 20 Nm (18 ft. lbs.).
2. Install rear transmission cooler lines to thermal bypass valve. Tighten fittings to 20 Nm (18 ft. lbs.).
3. Install front transmission cooler lines to thermal bypass valve. Tighten fittings to 20 Nm (18 ft. lbs.).
4. Install front transmission cooler lines into transmission cooler Service and Repair.
5. Lower vehicle.
6. Check transmission fluid level . Check Oil Level