Dynamics Sensor - Installation
INSTALLATION
1. Install dynamics sensor (3) over studs mounted to floor pan tunnel (4).
2. Install mounting nuts (2). Tighten nuts to 12 Nm (110 in. lbs.) torque.
3. Connect wiring harness (1) connector to module (3).
4. Install floor console. Floor Console - Installation
5. Connect battery negative cable (2) to battery post. It is important that this is performed properly.
6. Perform Verification Test and clear any faults Verification Tests.