Instrument Cluster - Installation
INSTALLATION
SEBRING
1. Install the cluster bezel onto the cluster by installing the four retaining screws (1).
2. Position the cluster in the instrument panel opening.
3. Connect the four electrical connectors.
4. Push instrument cluster forward.
5. Install the four retaining screws (1) to the instrument cluster.
6. Install the instrument cluster bezel Instrument Cluster Bezel - Installation.
7. Connect the battery negative cable.
AVENGER
1. Install the cluster bezel onto the cluster by installing the four retaining screws (1).
2. Position the cluster in the instrument panel opening.
3. Connect the four electrical connectors.
4. Push instrument cluster forward.
5. Install the upper retaining screws (1) to the instrument cluster.
NOTE: Dodge Avenger models are only equipped with two upper retainers.
6. Install drivers surround bezel Instrument Panel Bezel - Installation.
7. Connect the battery negative cable.