Upper
UPPER
1. Disconnect and isolate the negative battery cable.
2. Remove the throttle body air inlet hose (2) and air cleaner housing assembly Air Cleaner Body - Removal.
3. Remove the upper EGR tube (3) Exhaust Gas Recirculation (EGR) Tube - Removal.
4. Disconnect the brake booster hose (1) and the vapor purge hose (2) from the upper intake manifold.
5. Remove the two intake manifold support brackets (1).
6. Disconnect the electrical connectors from the Manifold Absolute Pressure (MAP) sensor (2) and the Electronic Throttle Control (ETC) (3).
7. Disconnect the Positive Crankcase Ventilation (PCV) hose (1).
8. Remove the seven manifold attaching bolts in reverse of the tightening sequence shown.
9. Remove the upper intake manifold.