FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation







INSTALLATION





1. Install the pressure control solenoid on to the valve body.
2. Install the bolts (1) to the pressure control solenoid and tighten to 6 Nm (40 in. lbs.).




3. Install the valve body oil pan, use a bead of MOPAR(R) ATF RTV (MS-GF41).
4. Install the upper valve body oil pan bolts and tighten to 6 Nm (50 in. lbs.).
5. Install the pressure tap at valve body oil pan and tighten to 6 Nm (50 in. lbs.).
6. Lower the vehicle on a hoist.




7. Install the solenoid pack connector (2) at valve body oil pan.
8. Raise the vehicle on the hoist.




9. Install the lower valve body oil pan bolts and tighten to 6 Nm (50 in. lbs.).




10. Install the bolt at the ground cable and tighten to 10 Nm (90 in. lbs.).
11. Install the clip to the valve body oil pan.




12. Move left side inner wheel splash shield (2) into place.
13. Install the left side inner wheel splash shield screws (1).
14. Lower the vehicle.




15. Install the bolts (1) holding the power steering lines (2) and tighten to 10 Nm (90 in. lbs.).




16. Install shift cable (1) to manual lever (2).




17. Install upper radiator hose (2) and clamps (1).
18. Fill the cooling system Service and Repair.




19. Install the relay (1) at the core support.
20. Install the battery tray Battery Tray - Installation.
21. Install the battery Battery - Installation.
22. Install the battery cables.
23. Fill transmission and road test Fluid Level and Condition Check - 62TE.