FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Battery - Installation







INSTALLATION





1. Position the battery in the battery tray.
2. Install the thermowrap (2) onto the battery by sliding it straight down.
3. Install the battery hold down bracket and retaining nut. Torque the nut to 20 Nm (180 in. lbs.).
4. Connect the battery positive cable (1). Torque terminal fastener to 4.5 Nm (40 in. lbs.).
5. Connect the battery negative cable (3). Torque terminal fastener to 4.5 Nm (40 in. lbs.).