Front Blower Motor Power Module - Installation
INSTALLATION
1. Position the front blower motor power module (1) into the front HVAC housing (3).
2. Install the two screws that secure the front blower motor power module to the front HVAC housing. Tighten the screws to 2 Nm (17 in. lbs.).
3. Connect the two wire connectors to the front blower motor power module.
4. Install the glove box onto the instrument panel (2) Instrument Panel Glove Box - Installation.
5. Reconnect the negative battery cable.