Installation
INSTALLATION
1. Place drive link/shield assembly into position.
2. Install two bolts (on outboard side of seat) attaching drive link assembly. Tighten to 10 Nm (7 ft. lbs.) torque.
3. Install third row seat. Seat - Installation.
4. Install rear floor stowage bin. Installation.
5. Close liftgate.