Installation
INSTALLATION
1. Position toe board heat shield to underbody.
2. Install heat shield nuts and tighten to 2.6 Nm (23 in. lbs.).
3. Check the exhaust system for contact with the body panels. Make the necessary adjustments, if needed.
4. Lower vehicle.