FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation







INSTALLATION





1. Position the 2nd rail and main guide assembly through the top of the rail.
2. Install the 2nd rail middle pin (2) and retaining clip (1).




3. Install the 2nd rail front pin (2) and retaining clip (1).




4. Install the main guide pin (2) and retaining clip (1).
5. Install the rear bow weatherstrip.
6. Manually close the rear bow and the tonneau cover Convertible Top - Standard Procedure.
7. Connect the negative battery cable.
8. Operate the convertible top and check for correct operation.