Powertrain Control Module - Installation
INSTALLATION
1. Install PCM to bracket.
2. Install the 3 bolts and tighten.
3. Install electrical connectors and lock.
4. Install Air Cleaner Housing.
5. Install air induction hose.
6. Connect negative battery cable and reprogram radio and clock.
7. Program the PCM.