FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Valve: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Resurface/Grind
NOTE
To Knurl Valve Guides, Add
Each0.10.0A
To Ream Guide, Add0.10.0A
To R&R Valve Guides, Add
Each0.20.0A
To R&R Timing Belt, Add1.30.0A
To R&R Camshaft, Add
One0.20.0A
Each Additional0.10.0A
One CYL
Right Bank6.64.7AIncludes: R&I Cylinder Head. Grind All Valves & Seats And Make All Necessary Adjustments.
Left Bank6.64.7AIncludes: R&I Cylinder Head. Grind All Valves & Seats And Make All Necessary Adjustments.
Both Banks8.76.2AIncludes: R&I Cylinder Head. Grind All Valves & Seats And Make All Necessary Adjustments.
All Cyls10.87.7AIncludes: R&I Cylinder Head. Grind All Valves & Seats And Make All Necessary Adjustments.