FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Installation

ENGINE OIL COOLER
1. Install radiator assembly.
2. Tighten oil cooler lines to radiator fittings to 18 Nm (160 in. lbs.).

COOLER LINES




1. Connect cooler lines to radiator fittings and retainer clip (Fig. 88). Tighten lines to radiator fittings to 18 Nm (160 in. lbs.).
2. Installation of NEW cooler lines:




a. Install new line fittings to engine block and oil pan (Fig. 89). Tighten fittings to 30 Nm (260 in. lbs.).
b. Position lines to fittings. Push line into fitting until it locks in place. Ensure proper connection is made by pulling in-and-out on line.
c. Connect lines to support bracket (Fig. 89).
3. Installation of the original cooler lines:
a. Position cooler lines to engine block and oil pan (Fig. 89). Tighten fittings to 30 Nm (260 in. lbs.).
b. Connect lines to support bracket (Fig. 89).

PRESSURE CONTROL VALVE
1. Install supply line fitting into engine block (Fig. 89). Tighten fitting to 30 Nm (260 in. lbs.).
2. Position control valve into fitting. Push valve into fitting until it locks in place. Ensure proper connection is made by pulling in-and-out on valve.
3. Connect supply line to control valve. Tighten connection fitting to 30 Nm (260 in. lbs.).