FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

P0750

Test 1 Through 2:




Test 3 Through 8:




Test 9 Through 11:






SYMPTOM:
P0750-LR SOLENOID CIRCUIT

When Monitored and Set Condition:
P0750-LR SOLENOID CIRCUIT

When Monitored:
Initially at power-up, then every 10 seconds thereafter. The solenoids will also be tested immediately after a gear ratio or pressure switch error is detected.

Set Condition:
Three consecutive solenoid continuity test failures, or one failure if test is run in response to a gear ratio or pressure switch error.

POSSIBLE CAUSES
RELATED RELAY DTC'S PRESENT
INTERMITTENT WIRING & CONNECTORS CONDITIONS
L/R SOLENOID CONTROL CIRCUIT OPEN
L/R SOLENOID CONTROL CIRCUIT SHORT TO GROUND
L/R SOLENOID CONTROL CIRCUIT SHORT TO VOLTAGE
TRANSMISSION RELAY OUTPUT CIRCUIT OPEN
L/R SOLENOID INOPERATIVE
TCM (L/R SOLENOID CIRCUIT)