| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace |
NOTE |
To Replace Cylinder Heads, Add |
One Bank | 2.7 | 1.9 | A | |
Both Banks | 4.2 | 3.0 | A | |
To Grind Valves, Add |
All Cyls | 3.1 | 2.2 | A | |
To Renew Piston, Pin or Connecting Rod, Add |
One | 0.2 | 0.0 | A | |
Each Additional | 0.1 | 0.0 | A | |
All | 0.7 | 0.0 | A | |
To Renew Main Bearings, Add | 1.2 | 0.0 | A | |
To Renew Crankshaft, Add | 1.7 | 0.0 | A | |
To Renew Oil Pump, Add | 1.6 | 0.0 | A | |
To Clean Oil Pump Screen, Add | 0.2 | 0.0 | A | |
To Renew Timing Belt, Add | 1.0 | 0.0 | A | |
Tune-Up, Add | 0.6 | 0.0 | A | |
One CYL |
Front Bank | 8.8 | 6.0 | A | Includes: Replace Connecting Rod Bearings & Hone Cylinder Walls. |
Rear Bank | 10.2 | 6.1 | A | Includes: Replace Connecting Rod Bearings & Hone Cylinder Walls. |
All Cyls | 13.6 | 9.4 | A | Includes: Replace Connecting Rod Bearings & Hone Cylinder Walls. |