Crankshaft: Labor Times
Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
Replace | 11.8 | 8.2 | A | Includes: Replace Rod Bearings And Main Bearings. |
NOTE | ||||
With Auto Trans, Add | 0.5 | 0.3 | A | |
To Replace Oil Pump, Add | 0.4 | 0.2 | A | |
To R&R Cylinder Heads, Add | ||||
One Bank | 1.8 | 1.3 | A | |
Both Banks | 2.7 | 1.9 | A | |
To Replace Cylinder Heads, Add | ||||
One Bank | 2.7 | 1.9 | A | |
Both Banks | 4.2 | 3.0 | A | |
To Grind Valves, Add | ||||
All CYL | 3.1 | 2.2 | A | |
To Remove CYL Wall Ridge, Add | ||||
All Cyls | 0.5 | 0.3 | A | |
To Replace Piston Rings, Add | ||||
All Cyls | 3.5 | 2.5 | A | |
To Replace One Piston, Add | 0.5 | 0.3 | A | |
To Replace One Connecting Rod, Add | 0.8 | 0.5 | A |