|  | Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | 
| Replace | 
| All | 12.7 | 8.9 | A | Includes: Replace Connecting Rod Bearings & Hone Cylinder Walls. | 
| One Cylinder | 
| Front Bank | 8.0 | 5.8 | A | Includes: Replace Connecting Rod Bearings & Hone Cylinder Walls. | 
| Rear Bank | 8.8 | 6.0 | A | Includes: Replace Connecting Rod Bearings & Hone Cylinder Walls. | 
| Both Bank | 9.8 | 6.8 | A | Includes: Replace Connecting Rod Bearings & Hone Cylinder Walls. | 
| Note | 
| With AC, Add | 0.4 | 0.2 | A |  | 
| To Remove Cylinder Wall Ridge, Add | 
| One Cylinder | 0.2 | 0.1 | A |  | 
| All Cylinders | 0.5 | 0.3 | A |  | 
| To Grind Valves, Add | 
| All Cylinders | 3.1 | 2.2 | A |  | 
| To Renew Piston, Pin or Connecting Rod, Add | 
| One | 0.2 | 0.0 | A |  | 
| Each Additional | 0.1 | 0.0 | A |  | 
| All | 0.7 | 0.0 | A |  | 
| To Renew Main Bearings, Add | 1.2 | 0.0 | A |  | 
| To Renew Crankshaft, Add | 3.6 | 0.0 | A |  | 
| To Renew Oil Pump, Add | 1.6 | 0.0 | A |  | 
| To Clean Oil Pump Screen, Add | 0.2 | 0.0 | A |  | 
| To Renew Timing Belt, Add | 1.0 | 0.0 | A |  |