| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| One Cylinder |
| Front Bank | 8.8 | 6.0 | A | Includes: Replace Connecting Rod Bearings & Hone Cylinder Walls. |
| Rear Bank | 10.2 | 6.1 | A | Includes: Replace Connecting Rod Bearings & Hone Cylinder Walls. |
| All Cylinders | 13.6 | 9.4 | A | Includes: Replace Connecting Rod Bearings & Hone Cylinder Walls. |
| Note |
| To Replace Cylinder Heads, Add |
| One Bank | 2.7 | 1.9 | A | |
| Both Banks | 4.2 | 3.0 | A | |
| To Grind Valves, Add |
| All Cylinders | 3.1 | 2.2 | A | |
| To Renew Piston, Pin or Connecting Rod, Add |
| One | 0.2 | 0.0 | A | |
| Each Additional | 0.1 | 0.0 | A | |
| All | 0.7 | 0.0 | A | |
| To Renew Main Bearings, Add | 1.2 | 0.0 | A | |
| To Renew Crankshaft, Add | 1.7 | 0.0 | A | |
| To Renew Oil Pump, Add | 1.6 | 0.0 | A | |
| To Clean Oil Pump Screen, Add | 0.2 | 0.0 | A | |
| To Renew Timing Belt, Add | 1.0 | 0.0 | A | |
| Tune-Up, Add | 0.6 | 0.0 | A | |