FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM
:
Car repair manuals for everyone.
Home
>>
Chrysler
>>
1997
>>
Sebring Convertible V6-2.5L VIN H
>>
Repair and Diagnosis
>>
Power and Ground Distribution
>>
Testing and Inspection
Power and Ground Distribution: Testing and Inspection
-
Circuit Z12 which supplies a ground for the PCM high current drivers, terminates at the left strut tower.
-
If the system loses ground for the Z12 circuit the vehicle will not operate.