Power and Ground Distribution: Testing and Inspection
- Circuit Z12 which supplies a ground for the PCM high current drivers, has the same termination point as the circuit Z11. The termination point is the right headlamp ground located at the right front frame rail.- If the system loses ground for the ganged circuits the vehicle will not operate. Check the connection at the ground eyelet.