FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Front Bank6.64.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Rear Bank5.94.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks8.86.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Each Additional0.90.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
To Renew Main Bearings, Add1.10.0A
To Renew Rear Main Oil Seal, Add1.60.0A
To Renew Oil Pump, Add1.90.0A
To Clean Oil Pump Screen, Add0.20.0A
With AC, Add0.40.2A
To Renew Crankshaft, Add4.70.0A
To Renew Lifters, Add
One Bank1.70.0A
Both Banks2.60.0A
To Renew Timing Chain, Add1.80.0A
To Renew Camshaft, Add3.90.0A
To Perform Tune-Up, Add0.60.0A
With PS, Add0.40.2A