Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Each Additional0.90.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.10.0A
Crankshaft, Renew4.70.0A
Oil Pump, Renew1.90.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew1.60.0A
Timing Chain, Renew1.80.0A
Lifters, Renew
One Bank1.70.0A
Both Banks2.60.0A
Tune-Up0.60.0A
Camshaft, Renew3.90.0A
One CYL
Front Bank6.64.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Rear Bank5.94.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks8.86.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.40.2A
With PS, Add0.40.2A