| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| One CYL |
| Front Bank | 7.3 | 5.2 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Rear Bank | 8.0 | 5.6 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Both Banks | 8.8 | 6.4 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
| Note |
| With AC, Add | 0.4 | 0.2 | A | |
| To Replace Cylinder Heads, Add |
| One Bank | 2.7 | 1.9 | A | |
| Both Banks | 5.3 | 3.8 | A | |
| To Grind Valves, Add |
| One CYL | 0.7 | 0.4 | A | |
| All Cyls | 5.0 | 3.6 | A | |
| Each Additional | 1.0 | 0.7 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |