Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Front Bank6.64.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Rear Bank6.24.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks9.26.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.40.2A
With PS, Add0.40.2A
Each Additional0.90.6A
Note
With AC, Add0.40.2A
With PS, Add0.40.2A
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew1.10.0A
Crankshaft, Renew4.70.0A
Oil Pump, Renew1.90.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew1.60.0A
Timing Chain, Renew1.80.0A
Lifters, Renew
One Bank1.70.0A
Both Banks2.60.0A
Tune-Up0.60.0A
Camshaft, Renew3.90.0A