FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Front Bank6.34.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Rear Bank5.94.2AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks7.45.3AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.40.2A
With PS, Add0.40.2A
Each Additional1.00.7A
Note
With AC, Add0.40.2A
With PS, Add0.40.2A
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew1.10.0A
Crankshaft, Renew4.70.0A
Oil Pump, Renew1.90.0A
Rear Main Oil Seal, Renew1.60.0A
Timing Chain, Renew1.80.0A
Lifters, Renew
One Bank1.70.0A
Both Banks2.60.0A
Tune-Up0.60.0A
Camshaft, Renew3.90.0A