|  | Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | 
| Replace | 
| One CYL | 6.7 | 0.0 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. | 
| Note | 
| With AC, Add | 0.4 | 0.0 | A |  | 
| To Replace Cylinder Head, Add | 2.7 | 0.0 | A |  | 
| To Grind Valves, Add | 
| One CYL | 0.7 | 0.0 | A |  | 
| All Cyls | 2.0 | 0.0 | A |  | 
| Each Additional | 1.0 | 0.0 | A |  | 
| Note | 
| With AC, Add | 0.4 | 0.0 | A |  | 
| To Replace Cylinder Head, Add | 2.7 | 0.0 | A |  | 
| To Grind Valves, Add | 
| One CYL | 0.7 | 0.0 | A |  | 
| All Cyls | 2.0 | 0.0 | A |  | 
| Piston or Connecting Rod | 
| Add the Following If Performed With Piston & Ring Jobs | 
| Main Bearings, Renew | 3.5 | 0.0 | A |  | 
| Crankshaft, Renew | 3.5 | 0.0 | A |  | 
| Oil Pump, Renew | 0.7 | 0.0 | A |  | 
| Oil Pump Screen, Clean | 0.2 | 0.0 | A |  | 
| Rear Main Oil Seal, Renew | 1.5 | 0.0 | A |  | 
| Timing Belt, Renew | 0.8 | 0.0 | A |  | 
| Tune-Up | 0.5 | 0.0 | A |  |