CB Series
Disassembly Procedure1. Remove the connector and fitting assembly (4).
2. Remove the O-ring seal (3).
3. Remove the control valve assembly (3) and the flow control spring (2) from the pump housing assembly (1).
Assembly Procedure
1. Install the flow control spring (2) to the pump housing assembly (1).
2. Install the control valve assembly (3) to the flow control spring (2).
3. Lubricate the O-ring seal (3) with power steering fluid.
4. Install the O-ring seal (3).
Notice: Refer to Fastener Notice in Service Precautions.
5. Install the connector and fitting assembly (3) to the pump housing (1).
- Tighten the connector and fitting assembly (3) to 75 Nm (55 ft. lbs.).