FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM
:
Car repair manuals for everyone.
Home
>>
Chevy Truck
>>
1999
>>
Express 1 Ton Van V8-5.7L VIN R
>>
Repair and Diagnosis
>>
Transmission and Drivetrain
>>
Automatic Transmission/Transaxle
>>
Service and Repair
>>
Overhaul
>>
4L60-E/4L65-E Automatic Transmission
>>
Repair Instructions
>>
15. 2-4 Band, Input Clutches, Input Gear Set Removal
15. 2-4 Band, Input Clutches, Input Gear Set Removal
1.
Remove the band anchor pin.
2.
Remove the input housing and shaft assembly and the reverse input clutch housing and drum assembly.
3.
Remove the 2-4 band assembly (602).