| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace |
Add Following Operations If Performed With Piston & Ring Jobs |
Camshaft, Renew | 2.9 | 0.0 | A | Does Not Include: R&R Engine. |
Main Bearings, Renew | 1.2 | 0.0 | A | Add The Following Operations If Performed Along With "Piston & Ring" Jobs. |
Crankshaft, Renew | 4.2 | 0.0 | A | Does Not Include: R&R Engine. |
Oil Pump, Renew | 0.6 | 0.0 | A | Does Not Include: R&R Engine. |
Oil Pump Screen, Clean | 0.2 | 0.0 | A | Does Not Include: R&R Engine. |
Rear Main Seal, Renew |
Manual Trans | 2.1 | 0.0 | A | Does Not Include: R&R Engine. |
Auto Trans | 0.9 | 0.0 | A | Does Not Include: R&R Engine. |
Timing Chain, Renew | 1.2 | 0.0 | A | Does Not Include: R&R Engine. |
Valve Lifters, Renew | 1.6 | 0.0 | A | Does Not Include: R&R Engine. |
Tune-Up | 0.8 | 0.0 | A | See Valves Grind, Head Removed & Combinations |
One CYL |
Right Bank | 8.5 | 6.5 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
Left Bank | 8.3 | 6.3 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
Both Banks | 12.5 | 9.5 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings. |
Note |
With AC, Add | 0.7 | 0.4 | |