Oil Cooler: Service and Repair
Oil Cooler Replacement
Removal Procedure
1. Drain the charged air cooling system.
2. Remove the oil pressure sensor (1).
3. Disconnect the oil cooler hoses (2).
4. Remove the oil cooler stud (3) and the oil cooler bolts (4).
5. Remove the oil cooler.
Installation Procedure
1. Install the oil cooler.
2. Notice: Refer to Fastener Notice in Service Precautions.
Install the oil cooler bolts (4) and stud (3).
^ Tighten the bolts and stud to 22 Nm (16 ft. lbs.).
3. Connect the oil cooler hoses (2).
4. Install the oil pressure sensor (1).
^ Tighten the sensor to 22 Nm (16 ft. lbs.).
5. Fill the charged air cooling system.