| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Complete Assembly With Transfer of Parts | 10.6 | 6.9 | B | Includes: Transfer All Fuel & Electrical Units. Does Not Include Transfer Of Optional Equipment. |
| Complete Assembly Without Transfer Of Parts | 8.0 | 5.3 | B | Does Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment. |
| Long Block | 14.6 | 10.7 | B | Includes: R&I Engine & Transfer All Necessary Components Not Supplied With long Block. |
| Short Block | 17.6 | 0.0 | B | Includes: R&I Engine & Transfer All Necessary Parts. |
| NOTE |
| To Grind Valves, Add |
| One Bank | 3.2 | 0.0 | B | |
| Both Banks | 4.3 | 0.0 | B | |
| Overhaul/Rebuild | 28.3 | 0.0 | B | Includes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons. Rings. Pins. Main & Rod Bearings, Grind Valves & Tune-Up. |