| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
| Replace |
| Note |
| With AC, Add | 0.2 | 0.1 | A | Includes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings. |
| With PS, Add | 0.5 | 0.3 | A | Includes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings. |
| Add Following Operations If Performed With Piston & Ring Jobs |
| Main Bearings, Renew | 1.2 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Crankshaft, Renew |
| Without Turbo | 3.4 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| With Turbo | 4.3 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Oil Pump, Renew | 2.6 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Timing Belt, Renew |
| Without Turbo | 2.3 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| With Turbo | 3.4 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| Tune-Up | 0.5 | 0.0 | A | Add Any Of The Following Operations If Performed Along With Piston & Ring Jobs. |
| One CYL | 6.6 | 4.7 | A | Includes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings. |
| All Cyls | 9.4 | 6.7 | A | Includes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings. |
| Each Additional | 1.0 | 0.7 | A | Includes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings. |