FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.10.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew3.60.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Oil Pump, Renew1.90.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Timing Belt, Renew1.20.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Tune-Up0.40.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
One CYL7.05.0AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Each Additional0.70.4AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
All Cyls8.05.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.