80. Main Case Wiring Harness Installation
1. Install the main case electrical connector (55), if removed.
2. Install the main case electrical wiring harness (80).
3. Connect the wiring harness to:
- the Band Control solenoid (323)
- the 1-2 shift solenoid (303)
- the 2-3 shift solenoid (307)
- the case connector (55)