80. Main Case Wiring Harness Installation
1. Install the main case electrical connector (55), if removed.
2. Install the main case electrical wiring harness (80).
3. Connect the wiring harness to:
^ the Band Control solenoid (323)
^ the 1-2 shift solenoid (303)
^ the 2-3 shift solenoid (307)
^ the case connector (55)