51 75 030 Removing or Installing/Replacing the Sound Insulation of the Upper Part of the Bulkhead
51 75 030 Removing Or Installing/Replacing The Sound Insulation Of The Upper Part Of The Bulkhead
Necessary preliminary work:
- Remove trailing link on spring strut dome
Release expansion rivet (1).
Unclip sealing (2) in direction of arrow.
Release screws (1).
Feed out sound insulation of upper part of bulkhead (2).
Installation note:
The gasket at the bottom of the sound insulation of the upper part of the bulkhead (2) must not be damaged.