Diesel Emissions Fluid Lines/Hoses: Service and Repair
16 19 005 Removing And Installing/Replacing Metering Line For Selective Catalytic Reduction (SCR)
IMPORTANT:
Ensure adequate ventilation in the workbay.
Avoid skin contact (wear gloves).
Avoid eye contact (safety goggles).
Urea/water mixture can escape when components carrying urea/water mixture are released. Have a collecting vessel ready.
Observe country-specific waste disposal regulations.
IMPORTANT:
Maintain conditions of absolute cleanliness.
Connections and covers of lines carrying urea/water mixture must be cleaned thoroughly with water after each removal or before each installation.
Thoroughly clean the working area with water after repair work.
Use fluff-free cloths for cleaning (see ETP Electronic Parts Catalogue WAYPALL L20 cleaning cloths).
Close connections and lines.
Thoroughly clean special tool with water after each use.
Necessary preliminary work:
- Remove active reservoir
- Remove right headlight
- Remove diesel particulate filter
Release screws (1).
Installation note:
Tightening torque 41 35 10AZ.
Disconnect plug connection (1).
Unclip line on module carrier (2).
Slacken nut (1).
Installation note:
Tightening torque 41 35 11AZ.
Tilt side panel outwards a little.
Raise outer module carrier (2) and feed out in downward direction.
NOTE: Picture shows engine and transmission removed for purposes of clarity.
Remove heat insulation (1).
IMPORTANT: Do not kink metering line (1).
Unclip metering line (1) from holders (2).
Unclip metering line (1) from holder (2).
Remove metering line (1).