54 37 235 Removing and Installing/Replacing Holder For C-Pillar Flap
54 37 235 - Removing and installing/replacing holder for C-pillar flap
Installation:
- Microencapsulated screws (Loctite) must be replaced and may not be reused
- Screw connection must be completed within 20 min. (start of curing)
- Microencapsulated screws must not be retightened
- Thread of nut must be cleaned beforehand in event of repeated use
Release Torx screws (1) for C-pillar flaps.
Tightening torque: 54 37 21AZ 54 37 Power Convertible Top.
Pull off snap ring (1).
Drive out pin and remove holder with spring.
Remove tension spring.
Overview of single parts.