16 19 110 Removing and Installing/Replacing Evaluation Unit on Active Reservoir
16 19 110 Removing And Installing/Replacing Evaluation Unit On Active Reservoir
IMPORTANT:
Ensure adequate ventilation in the place of work.
Avoid skin contact (wear gloves).
Avoid eye contact (protective goggles).
Urea/water mixture can escape when parts carrying urea/water mixture are released. Have a collecting container ready.
Observe country-specific waste-disposal regulations.
Necessary preliminary tasks:
- Remove right wheel arch cover front section
Disconnect plug connection (1).
Turn evaluation unit (2) a 1/4 turn in direction of arrow and remove.