FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

11 00 590 Exchange Engine

11 00 590 Exchange engine (N54, N54T)






Necessary preliminary tasks:
- Remove and install engine.
- Mount engine on assembly stand.
- If necessary, remove foreign bodies from turbocharger group.
- Check all assemblies and convert to replacement power plant.






Remove transportation locks (1).

Note:
Catch escaping engine oil with a suitable cloth (2).






Transportation locks (1) are no longer needed.






Modify screw plugs (1) from old power plant.

Insert screw plugs (1).

Tightening torque: 11 42 11AZ.

Secure oil cooler lines with mounting bar (2).






Assemble engine.