FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Valve: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Resurface/Grind
Right Bank18.813.0AIncludes: R&R Cylinder Head And Make All Necessary Adjustments.
Left Bank21.314.8AIncludes: R&R Cylinder Head And Make All Necessary Adjustments.
Both Banks27.619.5AIncludes: R&R Cylinder Head And Make All Necessary Adjustments.
Add the Following Operations If Performed With Valves, Grind
Valve Guides, Knurl
Each0.20.0A
Valve Guides, Renew
Each0.30.0A
Note
To Ream Guide, Add0.10.0A
Camshaft, Renew
One Bank0.30.0A
Both Banks0.50.0A
Timing Chain, Renew7.10.0A
Tune-Up1.00.0A