FREE REPAIR MANUALS & LABOR GUIDES 1982-2013 Vehicles
Courtesy of Operation CHARM: Car repair manuals for everyone.

Triple Roller Joint AAR 2900, Disassembling and Assembling






Triple Roller Joint AAR 2900, Disassembling and Assembling

Special tools, testers and auxiliary items required

Sleeve (VW 416 B)

Punch (VW 412)

Sleeve (VW 426)

Sleeve (3110)

Puller (Kukko 12/1)

Press Piece (2050)

CV Joint Boot Clamp Tool (V.A.G 1275)

Circlip Pliers (VW 161 A)

Pressure Spindle (3207)

Disassembling

- Knock out cap.

Use old bolt to knock out.

Hold shaft at approximately 20° for this.

Use plastic hammer and Press Support (3110).





- Remove any shavings in area of cover.

- Open the large clamping sleeve.

- Open the small clamping sleeve on the shaft and slide the protective joint boot back.

- Mark installation position of parts - 1 - to - 3 - with lines.





If they are not marked and are not re-installed in their previously installed positions, noises may occur later during driving operation.

A water-proof felt pen is well-suited for marking.

- Remove round seal - arrow - from groove.

1 Joint piece
2 Triple roller star
3 Drive axle

- Remove securing ring.





1 Pliers (commercially available)

- Pull triple roller star off drive axle. For this, use Puller (Kukko 12/1) (commercially available).





- Remove grease in groove for sealing ring.

- Check roller body and ball cage for wear.

- Clean shaft and housing.

Assembling

- Slide small clamp for joint protective boot onto shaft.

- Slide protective joint boot onto the shaft.

- Slide joint piece onto shaft.

- Slide the protective boot onto the joint.

Mounting triple roller star





- Before installing joint or triple roller star, splines - A - must be lightly coated with grease used in joint.

Chamfer - arrow - on star faces toward shaft, it facilitates assembly.





- Place triple roller star on shaft according to marking and drive on until impact.

- Insert securing ring, be sure to fit properly.

- Press 70 grams of Grease (G 000 605 ) from repair kit into triple roller joint.

- Slide joint over the rollers.

Make sure CV boot does not get twisted during this.

- Press 70 grams of Grease (G 000 605 ) from repair kit into rear side of triple roller joint.

- Thoroughly clean groove - 4 - for sealing ring.





- Insert O-ring - 3 - in groove - 4 -.

The individual parts are shown disassembled for the sake of a better illustration.

1 Securing ring
2 Cover from repair kit
3 Sealing ring
4 Groove in triple roller joint

- Insert axle shaft in vise.





- Lightly press on cover - 1 - from repair kit so that circlip from the repair kit can be inserted.

- Insert circlip from repair kit all around below engaging groove.

Make sure circlip engages audibly.

- Position joint in center position. See "min" - " max" position.





It is necessary to vent CV boot - arrow -, e.g. using a screwdriver, while positioning joint piece in center position.

- Install clamp - 2 -.





For a better alignment of multi-point socket head bolts when installing drive axle, clamping sleeve connecting tube - 2 - must be between joint connecting flanges - 1 -.

Tightening clamp on inner joint





- Tension small clamp using Pliers (V.A.G 1275 ).