Shift Interlock Solenoid: Testing and Inspection
CVT A/T 01J
Shift Lock Solenoid -N110-, checking
Note: This test must be performed if the specified values in the voltage measurement are not reached.
Additional special tools and equipment
^ Connector test U V.A.G 1594 A
Test sequence
^ Remove cover for shift control mechanism.
^ Disconnect harness connector at Shift lock solenoid -N110 -A-.
^ Attach multimeter for resistance measurement between contacts -B-.
^ Specified value: 22.3 ± 1 Ohms
If the specified value is not reached:
^ Replace shift lock solenoid.