Wastegate Solenoid: Testing and Inspection
WORK SEQUENCE
- Remove connector from multi-thermo switch
- Switch ON ignition
- Quickly brush ground with terminal as shown
- Clicking of the two-way valve must be heard
If NOT heard:
- Pull off terminal from wastegate solenoid (arrow)
- Connect multimeter US 1119 between terminal 1 (green/purple wire) and ground
- Specification: approx. 12 volts
- Connect multimeter US 1119 between terminal 2 (blue/black wire) and terminal 19 of control unit (see below)
- Specification: 0.0 ohms
If NOT OK:
- Check for open circuit in wiring or connectors
If still NOT OK:
- Replace wastegate solenoid